House Construction Packages in Bangalore

Explore Our Turnkey House Construction Packages in Bangalore for Your Dream Home. Build Premium House at affordable price with our Complete house packages.

ECONOMY

Rs.1,717/-Sq Ft

STANDARD

Rs.1,875/-Sq Ft

PRIME

Rs.1,990/-Sq Ft

LUXURY

Rs.2,350/-Sq Ft

SUPER LUXURY

Rs.3,850/-Sq Ft

GREEN HOME

Rs.1,990/-Sq Ft

Compare House Construction Packages

Construction Package Comparison
Specification
Economy
₹1717 per SqFt
Standard
₹1875 per SqFt
Prime
₹1990 per SqFt
Luxury
₹2350 per SqFt
Super Luxury
₹3850 per SqFt
ARCHITECTURAL CONCEPT DESIGN
2D Proposal Plan
Furniture layout
3D Elevation
Isometric views
Walkthrough External
Walkthrough Internal
VR Experience
Revisions on Design3331010
ARCHITECTURAL WORKING DRAWINGS
Brick work Layout
2D Elevation Layout
Cross Sectional layout
Door & Window Schedule
MEP DRAWINGS
Electrical Drawing
Plumbing Drawing
HVAC Drawing
STRUCTURAL DESIGN
Structural Design as per IS Code.
Good for construction drawings
Overalapped Structural, Architectural & MEP Drawings
3D structural drawings & Design Analysis Report
TESTS
In person site survey on the basis of measurement provided by client
Site survey by surveyor with instruments & drawing provided by client
Soil Test Report
CIVIL WORKS
Floor to Floor Height in feet91010.510.511
Slab thickness in inchesUpto 6Upto 6Upto 6Upto 6Upto 6
Column thickness in inchesUpto 8Upto 8Upto 8Upto 8Upto 9
Steel brandBhuwalka/Kamadenu/EquivalentBhuwalka/Kamadenu/EquivalentJSW/Sail/EquivalentJSW/Tata/EquivalentJSW/Tata/Equivalent
Steel Grade500 TMT550 TMT550 TMT550 TMT550 TMT
Steel basic cost upto Rs50000/ton60000/ton63000/ton69000/ton90000/ton
Cement grade43 or 5343 or 5343 or 535353
Cement basic cost upto Rs370/bag370/bag380/bag400/bag430/bag
Fine aggregate for masonryMsandMsandMsandMsandMsand
Fine aggregate for plasteringDW-PsandDW-PsandDW-PsandDW-PsandTW-Psand
Sump wall thickness in inches68886
Sump wall materialSolid BlockSolid BlockSolid BlockSolid BlockRCC
UG Sump capacity in liters6000700080001000012000
Concrete grade RMCM20M20M25M25M25
Wall materialSolid BlockSolid BlockSolid BlockSolid BlockBrick
External wall thickness in inches66669
Internal wall thickness in inches44444.5
External wall water proofing
Terrace waterproofing based onCementCementCementCrystallineCrystalline
Concrete Lofts
Ledge wall
FLOORING & WALL DADO
Parking floor₹ 35/SqFt₹ 60/SqFt₹ 60/SqFt₹ 65/SqFt₹ 150/SqFt
Foyer floor₹ 50/SqFt₹ 70/SqFt₹ 80/SqFt₹ 140/SqFt₹ 400/SqFt
Living floor₹ 50/SqFt₹ 70/SqFt₹ 80/SqFt₹ 400/SqFt₹ 400/SqFt
Bedroom floor₹ 50/SqFt₹ 70/SqFt₹ 80/SqFt₹ 140/SqFt₹ 400/SqFt
Kitchen floor₹ 50/SqFt₹ 70/SqFt₹ 80/SqFt₹ 140/SqFt₹ 400/SqFt
Kitchen wall₹ 45/SqFt₹ 55/SqFt₹ 60/SqFt₹ 65/SqFt₹ 150/SqFt
Bathroom floor₹ 45/SqFt₹ 60/SqFt₹ 60/SqFt₹ 70/SqFt₹ 150/SqFt
Bathroom wall₹ 45/SqFt₹ 60/SqFt₹ 60/SqFt₹ 65/SqFt₹ 150/SqFt
Balcony floor₹ 35/SqFt₹ 60/SqFt₹ 60/SqFt₹ 65/SqFt₹ 150/SqFt
Staircase₹ 100/SqFt₹ 100/SqFt₹ 110/SqFt₹ 140/SqFt₹ 400/SqFt
Grouting for floorCementCementCementCementCement
Grouting for bathroom floorCementCementCementEpoxyEpoxy
Flooring materialVitrified tileVitrified tileVitrified tile/ Smart marbleVitrified tile/ Smart marble/ Italian marbleVitrified tile/ Smart marble/ Italian marble
ELECTRICAL
Electrical points per 1000 SqFt35404550Unlimited
Switches & Plates makeAnchor ZivaAnchor romaAnchor romaLegrand britzyLegrand touch screen
Wires makeAnchor/Fire proofAnchor/Fire proofFinolex/Fire proofHavelles/Fire retardantHavelles/Fire retardant/Smoke proof
Conduits makeVIPVIPVIPVIPVIP
DB & MCB makeIndo asian/ScheinderSiemens/ScheinderSiemens/ScheinderABBABB
Home automationLimitedUpto Rs 75000
PLUMBING
Fresh water pipe brandAstral/Supreme/EquivalentAstral/Supreme/ EquivalentAstral/Ashirwad/EquivalentAstral/Ashirwad/EquivalentAstral/Ashirwad/Equivalent
Waste water pipe brandSupreme/EquivalentSupreme/ EquivalentAshirwad/EquivalentAshirwad/EquivalentAshirwad/Equivalent
Inspection chambersCombinedSeparateSeparateSeparateSeparate
Hot water line for Sink
Ground water recharge
FIXTURES
Kitchen sink & Accessories cost4500650095001500040000
Kitchen sink & Accessories brandStainless steelStainless steel/Granite/CarysilStainless steel/Granite/CarysilStainless steel/CarysilStainless steel/Carysil
CP & Sanitary fixtures cost per 1000 SqFt for 2 bathrooms3000036000380005000080000
CP & Sanitary fixtures brandCera/HindwareJaqaur/HindwareJaqaur/HindwareJaqaur/HindwareGrohe/Kohler
PVC overhead tankGangaGanga/KaveriGanga/KaveriSintex/KaveriSintex/Kaveri
DOORS
Main Door ( Teak frame + Teak shutter )20000250003000040000100000
Puja Door ( Teak frame + Teak shutter )20000250003000040000100000
Internal Door ( Sal frame + Flush shutter )80009000110001100020000
Bathroom Door ( WPC frame + WPC shutter )7500800080001000015000
Door HardwareOzone
Europa
Ozone
Europa
Ozone
Europa
Godrej
Hafele
Godrej
Hafele
Door HingesSS hingesSS hingesSS hingesSS hingesSS hinges
Cost inclusive of planning, Rebate and transportation
WINDOWS
Window specificationAluminiumUPVCUPVCUPVC/WoodUPVC/Wood
Window brandPlast one/ EquivalentPlast one/ Equivalentlesso/ EquivalentAIS/Fenesta/ Equivalent
Window grillMS grillMS grillMS grillMS grillMS grill
Basic price per SqFt4005505506501800
Doors and windows percentage1518202230
FABRICATION
Main gate per SqFt3303604004501000
External staircase Per rft5907509009001800
Internal staircase Per rft60075090011001800
Balcony railing Per rft5507509009001800
Utility grill upto 100 SqFt price per SqFt350
MS ladder budget30005000700015000
PAINTING
Internal painting
Putty coat22232
Primer coat11111
Paint coat2222 or 32
Internal paintTractor emulsionTractor emulsionTractor shine emulsionPremium emulsionRoyal shine
External painting
Primer coat11111
Paint coat22222
External paintAce weather proofAce weather proofApex weather proofApex weather proofApex ultima weather proof
Enamal painting
Primer coat11111
Paint coat22222
Enamal paintSyntetic enamalSyntetic enamalSyntetic enamalPremium enamalHigh end PU enamal
BrandAsian/Berger/DuluxAsian/Berger/DuluxAsian/Berger/DuluxAsian/Berger/DuluxAsian/Berger/Dulux
ELEVATION
Percentage considered in package0.50%0.75%2.00%
INTERIOR DESIGN
Concept design 2D and 3D
Site measurements
Working drawings
Material selection
GOVERNMENT LIASION ASSISTANCE
Construction Plan Sanction
Temporary Electricity connection
Permanent electrical connection
Water connection
Sewage connection
WARRANTY
Warranty10 years10 years10 years10 years15 years

*Note: Prices are per square foot (SqFt) and material brand names are subject to equivalent quality specifications. RCC design mix as advised by the structural engineer. Fabrication rates are for Per Square Foot (SqFt) or Running Foot (rft).

Terms & conditions
  • All prices mentioned are inclusive of taxes. Any additional taxes imposed by Central, State, or Local Authorities will be the responsibility of the owner.
  • The final cost will be based on the actual built-up area, calculated from the actual slab area constructed.
  • Rates are based on the scope outlined in the agreement. Any changes to the scope will incur additional costs. The minimum area of construction considered for calculation is 3000 sqft, reduction in area would change the cost.
  • All liaisoning fees and charges to relevant authorities must be paid by the client.
  • The foundation will follow the structural drawings and will be based on standard Soil Bearing Capacity (SBC) of 180KN/M². Isolated footings are valid only for dimensions of 5x5x5 ft.
  • The owner is responsible for providing water and electricity during the construction period.
  • The cost assumes standard earth excavation. If any concrete, stone, rock, or other obstacles are encountered during excavation that require additional work, extra charges will apply.
  • Any work not included in the initial quote will be billed separately at the listed prices, with applicable service charges.
  • All payments for statutory charges such as those to BBMP, BESCOM, BWSSB, including any deposits and bills, are the responsibility of the owner.
  • Any unforeseen issues with neighbours including soil/compound sliding, or statutory bodies must be handled by the owner.
  • The site and road levels are assumed to be the same for cost calculations. If there is any difference in levels that requires backfilling, this will incur additional costs.
  • Adequate space for a labour shed and storage must be provided by the owner within 50 feet of the project site. Small quantity procurement will attract additional costs.
  • The pricing assumes the use of base cost for raw materials and a minimum total builtup area of 3000 sqft.
  • Payments must be made as per the agreed-upon schedule in the contract.
  • If the client chooses to withdraw after the design phase is completed, a charge of Rs.100/- per sqft will apply.
  • The building structure comes with a 10-year warranty. However, age-related cracks are not covered, and the warranty will be void if any alterations are made to the structure.
  • The quotation is valid for 30 days from the date of booking. If the agreement is not signed within this period, the quote will be considered null and void.
  • Any details or services not specified in the package are not included in the scope of construction.
  • Any and all changes in the design post agreement will extend the timeline as well as increase the cost. The changes would be accommodated with additional service, design, labour and material charges.
  • The total cost of construction is arrived assuming the construction timeline which is directly related to the timely payments.
  • Material and labour cost escalation beyond beyond 5% is born by the client.
  •  

CONNECT WITH US

Let's start something great together

 Whether you seek your custom home, a top-class flat, land, or interiors, whatever you need, we’re here for you. Call us today, and we’ll have one of our staff members contact you within 24 hours.